![terminal-regaseificacao-bahia-transpetro](https://www.datamarnews.com/wp-content/uploads/2020/08/terminal-regaseificacao-bahia-transpetro.jpg)
Petrobras releases bidding notice for lease of regasification terminal
Aug, 04, 2020 Posted by Sylvia SchandertWeek 202032
On Monday, August 3, Petrobras released a bidding notice for the lease of the Bahia LNG regasification terminal (TR-BA) and its associated facilities. The bidding will be restricted to companies accepted in the prequalification call which will follow pre-established criteria. “The lease is in line with the company’s strategy of improving its capital allocation and building an environment favorable to the entry of new investors in the natural gas sector,” said Petrobras.
According to the company, the TR-BA has an island-type pier with all the necessary facilities for mooring a Floating Storage and Regasification Unit (FSRU) and a supply vessel under contract with the FSRU. The gas transfer is done directly between the FSRU and the supplier in the side-by-side configuration. The terminal’s gas pipeline is 45 kilometers long and 28 inches in diameter, connecting the TR-BA to two delivery points.
Source: Agência Brasil
-
Nov, 30, 2021
0
UNCTAD: World trade could reach US$ 28 trillion this year
-
Shipping
Sep, 16, 2020
0
CMA CGM ANNOUNCES CHANGES IN FEES ON SOME SERVICES
-
Ports and Terminals
Dec, 13, 2023
0
Brazil’s Portos do Paraná smashes records with over 60 Mt in 2023
-
Other Logistics
May, 05, 2023
0
SAAM closes deal to acquire tugs from Starnav for its Brazil operations