ANTAQ gives full authorization for DP World to fully its port facility in Santos
Apr, 29, 2020 Posted by datamarnewsWeek 202019
ANTAQ authorized DP World to fully operate the port facility TUP DP World Santos, located in Santos (SP). The Operation Release Term was published last Tuesday (April 28) in the Federal Official Gazette.
This gives authorization for the construction of 226.75m of the east quay and a mooring dolphin, concluding section 2 of the 447m quay planned for the berthing structures. This also allows for the integration of the previously authorized area of the pier with this area to form a total pier length of 1,100m. It is worth remembering that the authorization does not exempt the company from complying with the safety standards required for this operation, especially in relation to the Brazilian Navy, the Fire Department, and the environment agency.
-
Ports and Terminals
Jan, 13, 2021
0
Port of Santos accredits another regulatory yard for trucks
-
Ports and Terminals
Aug, 27, 2024
0
ANTAQ Approves Bidding Documents for STS08 Terminal at Port of Santos
-
Sugar and Ethanol
Apr, 11, 2024
0
Sugar exports grow 48.8% in March compared to a year prior
-
Automotive
Oct, 05, 2021
0
Importers Call for reduced import tax on hybrid and electric cars
