
New equipment arrives at TECON Salvador
May, 15, 2020 Posted by datamarnewsWeek 202021
On Wednesday May 13th, Tecon Salvador received three portainers (ship to shore cranes) and five RTGs (patio cranes on wheels), to be used in the area that is being expanded by the terminal.
RTGs handle 65 tons at a time, and will serve vessels similar to the largest container carriers in operation in the world, with a hoisting capacity of 51 meters. With the current investments in the expansion project (around R $ 443 million), the terminal, located in the state of Bahia, will be able to dock two large vessels (366 meters) simultaneously.
Source: Brasil Invest
Related Post
-
Grains
Feb, 07, 2025
0
Brazil’s Soy Exports in February Expected to Reach Up to 11.2 Million Tonnes, Says Anec
-
Ports and Terminals
Nov, 23, 2022
0
Dry season hampers cargo movement in Rio Grande do Sul state ports
-
Trade Regulations
Sep, 29, 2021
0
Plan to accept 6 new countries simultaneously into OECD may unlock Brazilian membership
-
Ports and Terminals
Feb, 18, 2022
0
New private terminals are expected to draw BRL 9.5 billion in investment