![Canal pANAMÁ](https://www.datamarnews.com/wp-content/uploads/2024/05/Canal-pANAMA-e1720629047603.jpg)
Panama Canal expects new water reservoir for ship crossings in 6 years
Jul, 11, 2024 Posted by Gabriel MalheirosWeek 202427
The Panama Canal expects to complete a billion-dollar construction of a new water reservoir within six years that will help ensure the passage of 36 ships a day, the administrator of the global waterway said on Monday, July 8.
The Indio River reservoir project would become part of the network of existing artificial lakes that allow for safe passage through the canal and provide water for human consumption.
“We are looking at six years,” canal administrator Ricaurte Vasquez said.
Vasquez said the new water reservoir project would bring to the Panama Canal “a little more certainty to maintain 36 transits per day, a higher level of reliability for the route.”
Last month, the Panama Canal said that after recent rains boosted water levels, it would increase the total number of available slots in both Neopanamax and Panamax locks to 35 slots after August 5.
Increased rainfall in recent months has allowed the canal, the world’s second-largest, to replenish its watershed, leading to an increase in transits that had been severely restricted last year amid a drought.
Ricuarte estimated the project would cost around $1.2 billion, plus an additional $400 million in investments in neighboring communities.
-
Economy
Apr, 19, 2022
0
The Brazilian trade balance was at a surplus of US$ 17.28bn until the 3rd week of April
-
Grains
Jul, 01, 2021
0
StoneX cuts forecast for 2nd corn crop in Brazil to 60.45m tons after frosts
-
Economy
Mar, 24, 2023
0
China buys 70% of soybeans and 63% of iron ore exported by Brazil
-
Shipping
Jul, 27, 2021
0
Ship with 14 crew with Covid-19 begins quarantine at the Port of Santos, SP