![Ulfrafértil](https://www.datamarnews.com/wp-content/uploads/2020/04/Ulfrafértil-1.jpg)
ANTAQ authorizes Ultrafértil to start warehouse operation on Cardoso Island in Santos
Apr, 12, 2020 Posted by Sylvia SchandertWeek 202016
The National Waterway Transport Agency (ANTAQ) authorized Ultrafértil S/A to start full operations at Warehouse 5, built at the Private Use Terminal (TUP) Luiz Antônio Mesquita – Tiplam Port Integrator Terminal, belonging to VLI and located on Cardoso Island, in Santos (SP). The company will be responsible for warehouse movement and/or storage of solid bulk (sugar). The Operation Release Term was published on Wednesday (8/4) in the Federal Official Gazette.
Warehouse 5 at Tiplam has 10,200 m² of built area and the capacity to receive 122,000 tons of sugar. The installation has systems for capturing solid waste and for draining and capturing contaminated effluents (water with sugar). The value of the investment made is approximately R$88 million.
-
Other Logistics
Apr, 06, 2022
0
New legal framework to possibly allow ‘paper railways’
-
Sugar and Ethanol
Jun, 23, 2020
0
Port of São Sebastião resumes sugar shipments after 15 years
-
Shipping
Mar, 09, 2020
0
Log-In acquires vessel for cabotage on South Atlantic service
-
Grains
May, 22, 2023
0
China’s soybean imports from Brazil fall further in April