ANTAQ authorizes Ultrafértil to start warehouse operation on Cardoso Island in Santos
Apr, 12, 2020 Posted by Sylvia SchandertWeek 202016
The National Waterway Transport Agency (ANTAQ) authorized Ultrafértil S/A to start full operations at Warehouse 5, built at the Private Use Terminal (TUP) Luiz Antônio Mesquita – Tiplam Port Integrator Terminal, belonging to VLI and located on Cardoso Island, in Santos (SP). The company will be responsible for warehouse movement and/or storage of solid bulk (sugar). The Operation Release Term was published on Wednesday (8/4) in the Federal Official Gazette.
Warehouse 5 at Tiplam has 10,200 m² of built area and the capacity to receive 122,000 tons of sugar. The installation has systems for capturing solid waste and for draining and capturing contaminated effluents (water with sugar). The value of the investment made is approximately R$88 million.
-
Other Cargo
Sep, 04, 2020
0
Brazilian cotton exports expected to grow in September
-
Dec, 02, 2021
0
‘China Factor’ still having effect; beef exports drop 49%
-
Economy
Nov, 19, 2021
0
GECEX reduces import tax to increase clean energy production
-
Trade Regulations
Aug, 03, 2023
0
Singapore intends to participate in the Port of Santos concession, says Ambassador