ANTAQ authorizes Ultrafértil to start warehouse operation on Cardoso Island in Santos
Apr, 12, 2020 Posted by Sylvia SchandertWeek 202016
The National Waterway Transport Agency (ANTAQ) authorized Ultrafértil S/A to start full operations at Warehouse 5, built at the Private Use Terminal (TUP) Luiz Antônio Mesquita – Tiplam Port Integrator Terminal, belonging to VLI and located on Cardoso Island, in Santos (SP). The company will be responsible for warehouse movement and/or storage of solid bulk (sugar). The Operation Release Term was published on Wednesday (8/4) in the Federal Official Gazette.
Warehouse 5 at Tiplam has 10,200 m² of built area and the capacity to receive 122,000 tons of sugar. The installation has systems for capturing solid waste and for draining and capturing contaminated effluents (water with sugar). The value of the investment made is approximately R$88 million.
-
Trade Regulations
Jul, 25, 2025
0
Venezuela imposes tariffs of up to 77% on Brazilian exports despite trade agreement
-
Other Cargo
Mar, 03, 2023
0
Fertilizers: Brazilian imports reach 2.104 million tons in February
-
Other Logistics
May, 10, 2022
0
Brazil wants increased access to fertilizers produced in Egypt
-
Ports and Terminals
Nov, 11, 2020
0
Port of Itajaí submits feasibility study schedule to Ministry of Infrastructure
