Argentina: unloading structure collapses at the Puerto Quequén terminal
Jun, 28, 2021 Posted by Ruth HollardWeek 202127
The unloading structure of the Pier Doce fertilizer terminal, located at turn 12 of the Necochea bank of Puerto Quequén, has collapsed in full operation.
The system was inaugurated just six months ago. The Puerto Quequén Management Consortium reported on the events in a statement. Although one operator fell into the water due to the collapse of the conveyor belt and hoppers, no casualties were reported.
Source: TradeNews
To read the full original article, visit the link: https://portalportuario.cl/argentina-se-derrumba-estructura-de-descarga-en-terminal-de-puerto-quequen/
Related Post
-
Ports and Terminals
Jul, 01, 2024
0
TCP Sees Inaugural Berth For New Monthly Service Connecting Brazil, Colombia And Mexico
-
Ports and Terminals
Jun, 23, 2025
0
Ports in Amapá and Rondônia record cargo throughput growth in April
-
Ports and Terminals
Mar, 12, 2024
0
Antaq move forward with five different leasing processes
-
Economy
Dec, 02, 2022
0
Brazil’s gross debt close to pre-pandemic level

