Lelystad dredger arrives to back up maintenance dredging of Port of Rio Grande channel
Dec, 30, 2022 Posted by Gabriel MalheirosWeek 202252
The coming of the Lelystad dredger at the Port of Rio Grande on December 24th strengthens the maintenance efforts on the Port of Rio Grande Canal. The dredger will fulfill the mission of accelerating and concluding the works in the first half of January. With the internal and external channel stages nearing completion, sediment removal has advanced to the Porto Novo area.
According to the director of infrastructure at Portos RS, Lucas Meurer, the Lelystad dredger has joined the fleet to meet the deadlines established by IBAMA (Brazil’s central environmental authority). Built in 1986, the barge is 136.97 meters long and 26.07 meters wide.
Source: Rio Grande Tem
To read the full original article, please access: https://www.riograndetem.com.br/draga-lelystad-chega-em-rio-grande-para-reforcar-a-dragagem-de-manutencao-do-canal-do-porto-do-rio-grande/
-
Ports and Terminals
May, 19, 2021
0
Port of Imbituba celebrates 1 year of pulp handling
-
Grains
Feb, 23, 2023
0
Wheat: shipments from around Rosario drop 86% in January
-
Tank and Reefer
Nov, 25, 2019
0
DataLiner: Export data for reefer and tank containers
-
Economy
Nov, 04, 2024
0
New Data Show 14.3% Uptick in Brazilian Container Exports Through September
