Vast Conducts Three Simultaneous Petrobras Oil Transfers at Port of Açu for First Time
Oct, 29, 2026 Posted by Gabriel MalheirosWeek 202644
Vast Infraestrutura’s T-Oil terminal at the Port of Açu, in São João da Barra, Rio de Janeiro state, conducted three simultaneous ship-to-ship (STS) crude oil transfer operations for Petrobras for the first time on October 18. The operations supported the transportation of crude from the company’s offshore production fields.
The very large crude carrier (VLCC) NT Eagle Victoria received oil from the Itapu field via the DP2 shuttle tanker Maran Lambada, followed by a shipment of Tupi crude transferred from the DP2 Rio 2016. The vessel then departed for Asia.
In a separate operation, the VLCC NT Eagle Valence received crude from the Búzios field via the DP2 Eagle Crato, followed by Atapu crude transferred from the DP2 Brasil 2014. The vessel was also bound for Asia.
Meanwhile, the Suezmax tanker NT Delta Ocean received crude from the Mero field via the DP2 Elka Paraná before departing for Europe.
Petrobras and Vast Expand Oil Transshipment Partnership
According to Vast, the simultaneous operations demonstrate improved efficiency in transporting crude from Petrobras’ Exploration and Production (E&P) operations and mark another milestone in the companies’ partnership, which began in 2019.
Vast and Petrobras recently signed a long-term take-or-pay agreement. Under this arrangement, Petrobras commits to minimum levels of terminal infrastructure use, providing greater operational predictability and reserved capacity.
T-Oil is Brazil’s leading ship-to-ship crude oil transshipment terminal. According to data from the National Waterway Transportation Agency (Antaq), it accounted for 48% of Brazilian crude oil exports handled through terminals in 2025.
The terminal is licensed to handle up to 1.8 million barrels per day and operates three berths.
In addition to Petrobras, Vast’s T-Oil customer portfolio includes ten other oil and gas companies: BW Energy, CNOOC, Equinor, ExxonMobil, Galp, PetroChina, PETRONAS, PRIO, Shell and TotalEnergies.
Source: Vast Infraestrutura
-
Shipping
Sep, 25, 2024
0
Porto Velho Port at Total Standstill for the First Time Due to Drought Implications
-
Meat
Dec, 23, 2021
0
Marfrig plant in Goiás appoved to export beef to the US
-
Blog News (ENG)
Feb, 23, 2024
0
Brazilian banana exports struggle with sluggish start in 2024
-
Grains
Jun, 26, 2024
0
Brazil set to be leading cotton exporter after 85% surge in shipments
